3.4.3.1 Process Miscellaneous Customer Requests : Process Miscellaneous Customer Requests Detailed Process Model Description : 4.7 5.3.2.2 Complete Physical Connection-Disconnection (Removal) Future Release

4.7 5.3.2.2 Complete Physical Connection-Disconnection (Removal) Future Release
Reference: Process Miscellaneous Customer Requests Process Model - Page 7 for the associated business process diagram.
Actor/Role: CSR, CC&B
Description: If meter or item is located at a non-billable service point, the process to remove meter or item is provided in 5.3.2.2 Complete Physical Connection-Disconnection (Removal).

© 2011 Oracle and/or its affiliates. All Rights Reserved