Reference: Process Miscellaneous Customer Requests Process Model - Page 7 for the associated business process diagram.Actor/Role: CSR, CC&BDescription: If meter or item is located at a non-billable service point, the process to remove meter or item is provided in 5.3.2.2 Complete Physical Connection-Disconnection (Removal).
| © 2011 Oracle and/or its affiliates. All Rights Reserved |